3 marine engines from National Maritime Museum

‘Agnes’: overheating bearing.

Sisson Marine: restoration and first steaming

‘Reliant’: restoration started: time capsule discovered;                 arrival of crankshaft and paddle hub.

Holmes Triple; pistons and valves missing.

‘Reliant’: restoration started; working on paddlewheel.

Yarwood Marine: restoration started;

JS White Marine: rebuilding started.

3 engines arrived from Bradford Industrial Museum.

‘Reliant’: crankshaft machined and welded together;

                started on paddle feathering gear;

                crankshaft fitted.

Yarwood marine: progress report.

JS White marine: rebuilt and steamed.

Flemming & Ferguson: large flywheel fitted.

Qualter Hall engine: restoration started - steamed

Yarwood Marine: trial steaming.

‘Reliant’: progress report on paddle wheel.

Holmes Triple: removed from the museum..

Engine from Bradford: restoration started.

2 Weir boiler feed pumps arrived.

2 marine engines on loan from Salters of Oxford.

‘Reliant’: progress report on feathering gear’

Extension to the museum started..

Extension to the museum completed.

Thornewill  & Warham: repairs to valve rods etc.

Mill Engine ‘Rhoda’ arrived.

‘Reliant’: restoration started on the steering engine.

Small engine by Farmer Bros. Restoration started.

Worthington Pump: restoration started.

Beam Engine: update on foundations/walls etc.

                       work on cracked bedplate;

                       working on the entablature.

Ship’s capstan and steering engines arrived; restoration started.

Steering and Capstan engines: update report.

Beam Engine: grinding rig designed and in use to                        refurbish the crankshaft journal.

Beam Engine: dismantled in College grounds.

                       arrived on low loader; restoration started

Plenty Marine Engine: completely rebuilt.

Ship’s capstan and steering engines: update.

Beam Engine: update - excavating for foundations;                        concreting base and walls etc.

                       various rods/shafts cleaned and polished;

                       badly corroded bearing journal.

‘Reliant’: steering engine completed and steamed.

                rudder mechanism under construction.

Farmer Bros. Engine: progress report: trial run on                       compressed air.

Robey two cylinder: adjustment to cross head.

Cameron Pump: restoration started.

Farmer Bros.: is it a steam engine or a vacuum pump?


From Year 2014

Beam Engine: finished grinding crankshaft journal;

                       machining bottom half of brass bearing.

Steering and Capstan engines:  completed restoration;

                                                  trial steaming etc.

Cameron pump:  machining bent crankshaft.

Evans pump:  restoration started.

Beam Engine: finished grinding crankshaft journal;

                       machining bottom half of brass bearing.

Steering and Capstan engines:  completed restoration;

                                                  trial steaming etc.

Cameron pump:  machining bent crankshaft.

Evans pump:  restoration started.

From Year 2015

Beam Engine: Alignment of main bearings;

                       Crank shaft installed;

                       Barring engine designed and installed.

Evans pump:  restoration continued;

                        New piston rods made;

                        Renewed inner main bearing.

From Year 2016

Beam Engine: HP & LP cylinders fitted to bedplate;

                       HP & LP eccentric rods and slide valves

                       fitted;

                       Entablature restored to original length,

                       walkway & safety hand rails installed;

                       Entablature  hoisted and secured to top

                       of columns.

Hayward & Tyler Steam Pump:

                       Restoration completed.

From Year 2017

Beam Engine: Parallel Motion assembled and fitted.                        Painted, and lining detail added.                        Lifted into place onto the columns.                        Aligned with cylinders etc.

                       Piston rods and pump rods attached.

From Year 2018

Beam Engine: Installation and commissioning of Esam                        Unijet 500 exhauster